This project encompassed the successful construction of a 12-story commercial complex, both during its assembly phase and upon its completion. A remarkable highlight of this endeavor is the 9-meter bridge that seamlessly connects the two sections of the building. Another intricate task encountered in this project involved the design of a 100-meter long structure without the utilization of expansion joints. Simultaneously, meticulous consideration was given to addressing all stresses arising from thermal influences.