A government-affiliated building, one of the structural challenges faced during its design was the presence of a concrete structure reaching a height of approximately 17 meters. Additionally, there is a cantilever inclined concrete section at a distance of 5 meters.view more
Crisis Management Center.
The project consists of two buildings connected by steel bridges. In one of the buildings, the structural system comprises a concrete frame with an 18-meter length, and the footings consist of both raft and isolated foundations.view more