The design of the building consists of 10 floors with interior spans reaching up to 9.0 meters, and 4.25-meter cantilever edge slabs.view more
Zahraan
This project consists of nine floors with a structural system that includes flat slabs and isolated foundations. One of the structural challenges in this project is the presence of a transfer beam system supporting a planted column that bears the load of seven floors above it.view more
Al-Barakeh 10
This project encompasses ten floors and employs a structural system featuring flat slabs and isolated foundations. Additionally, there are cantilever spans that extend up to 3.5 meters.view more
Sooq Yard
The project entails the construction of a 9-story building utilizing flat slabs and drop panels, all supported by a raft footing foundation. Additionally, the project includes cantilever slabs with spans reaching up to 4.5 meters.view more
Obaidi Complex
The project involves constructing a 10-story building with flat slabs and drop panels supported by isolated footings.view more
Al Rayyan
This project consists of 10 floors supported by a raft foundation and utilizes a flat slab structural system. It includes internal spans of 9.5 meters and cantilevers reaching up to 4 meters.view more
Al Bayed
This project comprises seven floors and features a structural system with flat slabs supported by isolated footings.view more
Sherbiny
Sherbiny is a project located in Saudi Arabia that consists of two buildings. The first building is an office building constructed with concrete and supported by raft foundations, featuring four floors with post-tension slabs. The second building is a factory structure with a steel frame, including a hangar, and utilizes isolated footings.view more